Total Villa: 6

Total Area: 2500 sqm / 26.910 sqft

PROJECT OVERVIEW:

Pre-construction phase with the client.

​

Generate a Building Information Modeling (BIM) project (including MEP’s) and proceeded to order ready to assemble CNC - bolted - CFS Structure (foundations, load bearing walls and roof)

​

Surveying, soil preparation, retaining walls, filling and compacting.

Build Foundations, erect structure, enclose façade with STO Panel (prefabricated), roof insulated panels, install double glass windows

from ES Windows.

​

Install all MEP’s.

​

Interior millwork and finishings.

​

Install pools and landscaping along with paver walkways and fences.

Azure-The-Villas-FRONT banner

Luxury condominium

azure logo villas

Azure"The Villas"

CONTRACTS:

​

Pre-construction phase with the client. Civil works, Interior finishings, Façade Finishings and Landscaping pool area.

Client

Azure

Location

ARUBA

Year

February - October 2021

elephant grey sabal

This was the first project in Aruba done with numeric control on each element of the building, Trimble robotics technology through a Building Assembly Model (BAM), resulting in less material waste, construction time reduced by 30%, a lesser impact on the environment since these are energy efficient villas.

THIS TRANSLATES INTO BENEFITS FOR THE DEVELOPER AND THE END USER.