Total Area: 300 m2
PROJECT OVERVIEW:
- Concrete pouring (slabs)
- Perimeter block walls (apartments, common areas)
- Dry Wall
- Façade: Vapor Barrier, CFS and Densglass, STO systems.
- Windows and Doors
- Tiling
- Millwork (doors, closets and kitchen cabinets).
- General finishings
- Inspection of other trades: MEP's

12 fully furnished luxury apartments, with a total area of 300m3 with terrace and pool area.

Installation phase
The project is currently focused on the installation of essential components that enhance both functionality and aesthetics. are diligently working on floor coverings, showers, windows, railings, and facades to ensure a beautiful and safe environment.

In addition, fire tanks and exterior work in common areas are being completed, alongside the installation of furniture such as kitchens, closets, and bathroom fixtures.