top of page

Total Area: 350 m2
PROJECT OVERVIEW:
- Concrete pouring (slabs)
- Dry Wall
- Façade
- Windows and Doors
- Tiling
- Millwork (doors, closets and kitchen cabinets).
- General finishings

Introducing our remarkable new development in Aruba, featuring a generous 350 m² construction area that boasts panoramic views of both North coast and the Hotel Area.
Energy-Efficient Installations
This project use an advanced facade system known as EIFS, which involves applying a vapor barrier directly to the blocks for optimal protection. We incorporate high-density Anime (2") EPS, complete with mesh and basecoat before finishing with quality products from STO, a brand we are certified to install. In addition, we implement a MEPS (VRF conditioning) system featuring P3 duct, designed for efficiency and reduced cooling needs, promoting an environmentally friendly GREEN approach For plumbing, we rely on VIEGA (PEX) systems, which minimize connections and save time, effectively reducing the risk of water leaks.

Our new window system features double-glazed glass with thermal bridge profiles, significantly enhancing the energy efficiency of the home. This advancement not only improves insulation but also helps reduce energy costs.
bottom of page