Total Area: 7.000 sqm / 75.348 sqft
PROJECT OVERVIEW:
1. Main Façade:
- Design, calculation and installation of steel structure (including the Top Arch) and waterproofed substrate to receive the Dri-Design façade system. Install Dri-Design and the structural corporate letter’s “CMART” steel support.
- Removal of glass façade, and install CFS structure with densglass, base coat and stucco, paint.
Surveying, Demolition and Excavation, Pouring concrete:
- Define the layout of walk-in coolers, freon lines and drains.
- Perform demolition of concrete floors, pouring concrete with precise finishing.
2. Plumbing:
- Design and install all sewer and gray water lines towards septic and irrigation tanks.
- Design and build septic and irrigation tanks along with grease traps.
- Design and install water lines, including hot water re-circulation from walk-in cooler compressors.
3. Elevator shafts:
- Build 3 elevator shafts, including top bearing beam.
4. Dry wall, mudding and painting:
- All interior walls, ceilings, floating ceilings.
- General painting, columns, beams, masonry walls.
5. Compressor Room:
- Design and build with steel structure, metal deck, and CFS walls.
- Finishing: waterproofing, epoxy paint, base coat and paint.
6. Trash area:
- Demolition, excavation, septic design and construction.
- Pouring concrete
- Building masonry walls with plaster.
7. Tiling:
- Repair, and set floor and wall tiles on all interior areas.
8. Fish area:
- Build a drywall and double glass panels room for fish prepping area.
9. Façades:
- Set dens glass with base coat and paint on North façade
(main entrance)
- Repair and paint East Façade.